Load Shedding Status

 In Business

https://www.citypower.co.za/customers/Pages/Load_Shedding_Downloads.aspx

 

Load Shedding Status

We are currently LOAD SHEDDING – Stage 2

 (in-progress)

 
 
Load Shedding Stage 2 will continue all day Monday 09/12/2019 until 23h00 and the risk of load shedding remains high for the week.
 
Suburbs under the blocks below will be affected
04h00 – 08h30 Blocks 3A and 7A
08h00 – 12h30 Blocks 4A and 8A
12h00 – 16h30 Blocks 5A and 1B
16h00 – 20h30 Blocks 6A and 2B
20h00 – 23h00 Blocks 7A and 3B

NB: The Load Shedding Schedule together with the Blocks – suburbs information can be downloaded below. The Load Shedding Schedule indicates the time and when the block will be affected. The suburbs – blocks information indicates all suburbs associated with the affected block as per the Load Shedding Schedule.

 

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.